Originally Posted by scryer View Post
They've started construction on what they are calling is preliminary work on 104tha and 148th. I'm not sure what they are doing but I have walked by it a couple of times. Does anyone have any insights?
The Project: Surrey LRT

104 Avenue Feeder Watermain Relocation

A 600 mm watermain currently runs down the centre of 104 Avenue, under what will be the future LRT track. The section of that watermain between City Parkway and 144 Street is being relocated now, prior to construction of LRT.

104 Avenue Trunk Storm Sewer Relocation

A 900 mm storm sewer pipe runs down the centre of 104 Avenue under what will be the future LRT track. The section of pipe between 148 and 150 Streets is being relocated now, prior to construction of LRT.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:12 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.