View Poll Results: What should be prioritized on Elgin? (You can choose more than one option)
Driving 8 10.00%
Transit 33 41.25%
Cycling 25 31.25%
Pedestrians 67 83.75%
Patios 40 50.00%
On-street Parking 5 6.25%
Multiple Choice Poll. Voters: 80. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 30, 2018, 5:06 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 410
Quote:
Originally Posted by roger1818 View Post
I believe those costs were not assuming any other work will be done on the street or the wiring. The street will be dug up to replace the water mains and all of the poles and wires likely need to be replaced as part of the street work anyway, so the actual cost will be lower, especially when you only consider the incremental cost.

According to this article, "An underground circuit typically costs anywhere from 1 to 2.5 times the equivalent overhead circuit." With the city already digging up the street, I suspect the costs will be on the lower end.
From a risk mitigation standpoint alone (given our crappy winters/wild stromy summers) O/H circuits should be buried when major renewal work is being carried out - everywhere.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation