HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 7, 2018, 12:54 AM
alt_center alt_center is offline
Registered User
 
Join Date: Aug 2017
Location: Saskatoon
Posts: 328
April 6, 2018 Pictures:

Not many changes but I'll post pictures anyway.



^^^^ I had a look at the walls between the units, and I don't see any double walls. Perhaps they will double up the walls between the units later. I can think of a whole host of logistical issues regarding constructing double walls, especially if there is drywall on one or both of the inside surfaces (as shown in the diagram in a previous post). Right now there does not appear to be any drywall being installed, but they are doing the plumbing and wiring.











^^^^ The red crane has not been used since it was moved. Part of the boom is still on the ground.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.