Quote:
Originally Posted by WarrenC12
Wow, brutal. What is the above ground Capstan station costing?
At this rate, 33rd will never get built. They've already "redeveloped" around there.
|
It's actually referenced in that City document:
"The November 15, 2017, Vancouver Sun article cites a cost of “about $27.8 million” for the above ground Canada Line station at Capstan Way in Richmond, of which the City of Richmond has reportedly collected $19.36 million from developers near the proposed station over the past six years in the form of amenity contributions".
I bet there is some form of subway/LRT along 41st before there is ever a station at 33rd.