HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 2, 2017, 6:22 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,104
Quote:
Originally Posted by Charles5 View Post
You may wish to check out para 2.2 (b) of the City's response to CTA which clearly indicates that the 3 year plan now and in the past has stated the intention to retain the POW bridge.
https://www.letsgomoose.ca/wp-content/up...Show-Cause-Response-Case-No-17-01....pdf
I think I misinterpreted MOOSE's original document (paragraph 5) on the matter. Sorry about that.

This still leaves "b) The city dismantled part of the railway without following the proper procedures outlined in the law." up for debate.
I should also add the MOOSE's case could include "obstructing a federal railway" to their case. Either in the sense that they've literally blocked off the previous path for the rail, or they have not included adequate clearance under the Albert Street bridge.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:42 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.