The excavation to install the fabric has now been extended around the corner to the north side. There are rolls of fabric in the trench awaiting installation. The removed material has been loosely dumped on the sloped sides of the original excavation.

They had been picking up the pace of backfilling. I'm sure this oversight has delayed clearing the office tower site by at least a week if not more.