It may be possible to partially occupy this while the upper portions continue work.
As long as the various critical systems to operate the building are installed where it does not have to rely on equipment at the rooftop level (plus the roof could be reserved for the residential equipments anyway)
There are other areas like a third floor mechanical and some rooms in the main and P1 that can have the various equipment installed to run the office portion of the tower as the complex floorplates for the units begin to get formed.
I think this is what was done for the Trump tower in Chicago where the hotel was already open yet the bldg hadn't even topped out.
__________________
Follow @kimbo_snaps on Instagram &
Bokimon- on Flickr for SSP local & Travel coverage.
Architecture, Aviation, Scenery, Skylines
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 11:34 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.