It may be possible to partially occupy this while the upper portions continue work.
As long as the various critical systems to operate the building are installed where it does not have to rely on equipment at the rooftop level (plus the roof could be reserved for the residential equipments anyway)
There are other areas like a third floor mechanical and some rooms in the main and P1 that can have the various equipment installed to run the office portion of the tower as the complex floorplates for the units begin to get formed.
I think this is what was done for the Trump tower in Chicago where the hotel was already open yet the bldg hadn't even topped out.