Quote:
Originally Posted by ScoutDog
I have I o good authority that this project is ago for the fall. There is delay due to a significant change in structural design.
|
Welcome and thanks for the information. Is there a significant change in the size, height and layout of the building as well? Has the project been downsized at all?