HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 25, 2016, 7:37 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by bomberjet View Post
I wonder what will come of the skywalk connection. Looks like the first phase will connect through Shark Club still, somehow. But the loop southwards to the convention centre is contingent on the Sutton Place thing going ahead. So may never happen, as we all now to well in these parts.
Well, if TNSE controls the site they could conceivably just build a temporary skywalk connection from TNS to RBCCC. Wasn't there something like that at Graham and Fort before 200 Graham was built in the early 90s?

Even if they didn't though, there would still be a skywalk connection between TNS and RBCCC (circuitous as it might be), and the two would only be a short distance apart along Carlton.

Although that said, I hope this thing gets built and we aren't faced with the typical Winnipeg unrealized phase 2.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 6:21 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.