Quote:
Originally Posted by WhipperSnapper
$500 million + the cost of the bridge option for let's say ... a kilometre of tunnel is plain stupid.
|
That I fully agree with you on. It would be silly to do if that is the difference. Likely best to make such a decision after all the detailed costing is done in that case I suppose.