Should the new Calgary Greenline go over the bow or under the bow?
If a bridge results in $500 million in savings over the tunnel option, it's the obvious choice.
If a bridge results in $500 million in savings over the tunnel option, it's the obvious choice.
I think one of the major challenges with the bridge is how it tunnels once in downtown. Could be a big disruption to a street and neighbouring properties.
Are you serious?!? I can't imagine a tunnel under the Bow costing more than half that much; maybe even half of that. It's definitely not the cost of a bridge, the two tunnel egresses and, 500 million!!!
Big if, IMO. It's going to be tunneling for a while north and south of there, so I don't fully believe that surfacing and building a high quality (expensive) bridge then diving into a tunnel again through the unstable bluffs will be cheaper. Sounds a lot more complicated to me, and complexity means cost.
And I say that as someone who has always thought the bridge would be a great option.
I think one of the major challenges with the bridge is how it tunnels once in downtown. Could be a big disruption to a street and neighbouring properties.
Fully agreed.
True, but if it is going to be a bridge, it should be a more efficient elevated line, so the point is moot.
Yes it would cost that much, especially when you consider how much extra length of tunneling it would require on the north side of the river if you sunk the train so deep. That means the incremental cost of tunneling below the Bow River is not just limited to the tunnels under the river. This has been extremely well documented. Surprised you are surprised.
No offense but, I don't believe a word you say. It makes no sense that the difference in cost would be $500 million for less than a kilometre of tunnels even in Calgary's fractured shale.
No offense taken, but if you "don't believe a word say", why do you respond?
The increase in length of tunnels between options C and D are significantly more than a kilometer. Additionally, the increase in cost is not just all of the increased tunneling and related utilities for the tunnels, but also the way more expensive costs of the stations that would then be buried way further with option D. Virtually each and every piece increase in price substantially with the burial option.