Posted May 6, 2016, 12:10 PM
|
|
Registered User
|
|
Join Date: Feb 2012
Posts: 4,777
|
|
Talking about tower cranes I just looked out my office window and it looks like the first truck of parts arrived. Looks like it could be the base frame and power supply panel. Over the last two days Manitoba Hydro was installing the feeder lines and a transformer to the site for heavy duty power.
|