Posted Apr 29, 2016, 4:52 PM
|
 |
Registered User
|
|
Join Date: Aug 2008
Location: Moncton NB
Posts: 641
|
|
It's infrastructure work http://www.moncton.ca/Government/Media_R...esidents_affected.htm?platform=hootsuite
Quote:
|
The water interruption is in conjunction with the New Brunswick Department of Infrastructure who are currently working on the widening of Elmwood Drive, which requires an installation of an isolation valve north of Ogilvie Brook.
|
Quote:
Originally Posted by gehrhardt
Lots of equipment on the large site at the northwest corner of Elmwood Dr and Caledonia Rd. I'm not sure if this is for the infrastructure improvements on Elmwood, or for developing the site.
Some of the equipment is quite far from the road, although I'm not sure if that makes a difference.
|
|