Posted Apr 26, 2016, 11:56 AM
|
 |
Registered User
|
|
Join Date: Aug 2012
Posts: 3,476
|
|
There's a 2.9m high curtain wall screen to go on top of the finished level of the cncrete roof slab - so it's effectvely adding another floor to the building.
Height to the top of the concrete structure is currently 254.4m.
|