Quote:
Originally Posted by People.talking
ok I'm confused again, are they connecting the green line to merge in with the 7th ave transit corridor or are they going to re route it to be next to the Cp rail line?
|
I think I misunderstood you. The line is supposed to go down 2nd street before turning onto 10th ave. I was thinking along the lines of a big transfer station where the three LRT lines would all come within 80m of each other - I wasn't thinking of an intercity/regional rail station tied into just the green line.