HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 3, 2016, 10:30 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,023
January 19, 2016:


http://www.tsawwassenmills.ca/node/64

Winter 2016 Update:

Quote:
CONSTRUCTION OF TSAWWASSEN MILLS

WITH LESS THAN A YEAR UNTIL THE GRAND OPENING OF TSAWWASSEN MILLS, CONSTRUCTION IS PROGRESSING QUICKLY.

Roof and skylight installations are now complete, along with paving of the 6,000-stall parking lot. Crews have also installed parking lot lighting.

The custom exterior for anchor tenant Bass Pro Shops is nearly complete and interior tenant improvements will soon begin throughout the mall. Power and water are also now functional within the entire shopping centre.
http://www.tsawwassenmills.ca/node/64
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 1:07 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.