Quote:
Originally Posted by bomberjet
The City is looking at connectivity of the Disraeli AT path to the Raleigh/Gateway path. And connectivity in general. But it is rather cumbersome to get on the bridge no doubt.
The design in general at the north end of Disraeli isn't the greatest. Ever try merging onto Henderson from either Talbot or Midwinter during rush hour? I seen one guy banging his head on the steering wheel the other day haha
|
If you follow the metro route signs you should be turning north to get to Johnson Ave then turn on Henderson to go either north or back south to get to Hespler.