Quote:
Originally Posted by ClaytonA
Found this table in the publicly accessible January 2005 SELRT Future projections study of preliminary ridership estimates. It's dated now, but with Lynnwood, Ogden, and South Hill being appreciable, it's not as bad as the criticism that it needs to reach Douglasdale/McKenzie Town before significant ridership. Note that 1.25 million population was supposed to be reached in 2033, not 2016-7ish.
|
It's not as bad? It's worse. I dug up the 2005 platform counts by line. Only one of the 13 stops was even above average; 6 of the 10 lowest ridership stops are on the SE.
Link for full size