Posted Apr 8, 2015, 4:25 AM
|
 |
Registered User
|
|
Join Date: Dec 2013
Location: Downtown Austin
Posts: 415
|
|
The southern portion of Berkman is prepped for paving and should be paved this week up to Zach Scott. I'm assuming it'll be open for traffic by the middle of the month.
|