The 417 overpass of the Trillium Line is scheduled for rapid replacement by the MTO sometime between 2016 and 2018. That's one less structure standing in the way of a double-track Trillium Line
Over the next 20 years or so there's probably going to be lots more life-expired structures being replaced.