Quote:
Originally Posted by Ziobrop
|
Wow... seeing that still kinda gives me the shivers. I mean, I'm sure all the loading calculations have been done and I know that this procedure is done all the time, but I still can't get my head around the ability of that building to support such a dynamic load while it's being disassembled. After all, the stresses on the beams will change every time an adjacent beam/column is removed and those excavators weigh a little more than a feather.
Great photos though!