Originally Posted by aberdeen5698 View Post
Nice shots, thanks!

Interesting that they're using precast beams for this elevated segment. I guess it's not long enough to justify the cost of transporting and assembling the launching truss, or perhaps it's a scheduling issue with the truss not being able to be in two places at the same time (and therefore saving on the cost of a second one).
Man. The generation-over-generation improvements of precast beams. I can see the Expo Line out my window, but looking at this picture... My goodness they're so low profile that I'm drooling. mad.

I take it, it's a scheduling thing. The truss is the fastest way to get elevated segments in place..... but if you can get a perfectly acceptable precast job still going on at the same time elsewhere, you get double productivity of course
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.