HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    FMC Tower at Cira Centre South in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 19, 2013, 2:05 PM
ichigo ichigo is offline
Registered User
 
Join Date: Apr 2006
Posts: 75
Quote:
Originally Posted by Philly Fan View Post
What a tight site--not much room to maneuver. Must be quite a logistical challenge.
yeah, pretty much. They only have sidewalk and a lane of traffic blocked of and some space upfront by Schuykill Ave. They've been parking concrete trucks on 30th between market and chestnut while they wait for their turn.

Actually now that I think about it, they might be driving all the construction materials to the empty lot on the other side of the parking structure. Walnut side where Cira Center 2 is suppose to be... and the crane just lifts all the stuff over the parking structure and to the construction side. That lot is pretty big and easy for construction trucks to access. I'll check during my lunch break if this is true.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.