HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 14, 2014, 4:35 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,803
Quote:
Originally Posted by Tetsuo View Post
I wouldn't be surprised if NW's estimate includes the Royal Ave tunnel and other upgrades.
I know next to nothing about bridge construction, but it seems pretty obvious to me that an extra lane on the bridge means you need to provide extra lanes on the approaches too. That either means new approaches or upgrades to the existing ones. So it's perfectly reasonable to include costs like the Royal Ave. overpass in the cost of the 6-lane bridge. Those kinds of costs wouldn't be incurred in a 4-lane bridge if the alignment was reasonably close.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:41 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.