Quote:
Originally Posted by Keith P. View Post
...Also in those minutes is the info that they did not prepare a detailed cost estimate of the palace before making the budget ask. They used notional estimates and comparable projects but did not do a line by line detailed construction budget. ...
I would expect that comparable projects and cost/square foot would be appropriate prior to construction drawings appropriate for tender.

I would also expect that construction drawings appropriate for tender would have enough information for detailed elemental cost estimating, but that to do a Class A estimate at concept, schematic design, or design development stages would be premature.

I feel like the budget would have to be approved prior to hiring the architect, and thus before detailed materials and assembly information was available... likely at, or after, the space (and maybe functional?) programming done by HOK.

At what point in the process did the budget ask you describe occur?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 5:51 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.