HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 5, 2012, 2:42 AM
Arquitect's Avatar
Arquitect Arquitect is offline
Registered User
 
Join Date: Jun 2012
Posts: 500
Quote:
Originally Posted by PhxER View Post
I got an email from ASU telling me that the Design Annex (the building on the northwest corner of 7th street and College) needs to be cleaned out by December 12th because they are going to start construction on December 13th.
Indeed. It will be mostly demo and prep work. The actual construction is supposed to start early next year.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 11:11 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.