HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 30, 2012, 6:32 AM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Oh, and the reason the N-S LRT shouldn't have been built is because of the downtown section running on roads, not because it terminated in Barrhaven. I'd rather have 1st phase LRT running in conjunction with O-Train and the Barrhaven Transitway than what was proposed for 2009.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.