Posted Aug 30, 2012, 6:32 AM
|
|
Registered User
|
|
Join Date: Mar 2011
Posts: 1,639
|
|
Oh, and the reason the N-S LRT shouldn't have been built is because of the downtown section running on roads, not because it terminated in Barrhaven. I'd rather have 1st phase LRT running in conjunction with O-Train and the Barrhaven Transitway than what was proposed for 2009.
|