Quote:
Originally Posted by You Need A Thneed
Explained pretty well in previous posts. In short, the options are to interline with the NE line, or build a new ROW into downtown. Interlining is unacceptable due to
limiting capacity on both the lines being interlined.
|
At grade separated headways with modern interlocking interlining is a non-issue. if that is incompatible with your belief system... I apologize.