HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Feb 27, 2012, 4:21 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by dreambrother808 View Post
I don't believe that we can afford them both at the same time. Ideally, we could but in the end we might have to choose one over the other.
I think we can. Instead of building one line after another, we build half of each for phase 1 (ie. VCC-VGH, King George-Newton), and then extend them when funding is available (VGH-Arbutus, Surrey Central-Guildford; Arbutus-UBC, Surrey Central-Fleetwood/Langley). Although both extensions would have to be SkyTrain this way, or it wouldn't make sense to operate a 3-5km stub.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.