They have done quite a bit of work along that stretch in the last week or two. They have already flattened out a lot of the pre-loading along S Fraser Way and crews are doing a lot of work to the rail bridge structures. Crews seem to be replacing the last remaining wooden structures with steel supports, and I don't really know what they are doing along the Interurban tracks, but it's big (maybe making room for the road lanes to go under it?).
|