HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Feb 9, 2012, 10:02 PM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
They have done quite a bit of work along that stretch in the last week or two. They have already flattened out a lot of the pre-loading along S Fraser Way and crews are doing a lot of work to the rail bridge structures. Crews seem to be replacing the last remaining wooden structures with steel supports, and I don't really know what they are doing along the Interurban tracks, but it's big (maybe making room for the road lanes to go under it?).
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.