Quote:
Originally Posted by DoubleK
This is a huge misconception about the dedicated Busway. Everyone has this notion that you can build a road then in the future slap some rails on it and Bob's your uncle.
In reality there is very little to no synergies between the civil works required for a road and a LRT line. Basically bridges and that's about it. Acquiring the right of way now spreads that cost over time, which is a positive.
|
Chris didn't say they were going to convert road to rails.