Bi-weekly SEFC update | May 3rd, 2011

SEFC from Second Avenue and Cambie Street.

Taken by SFUVancouver, May 3rd, 2011.


SEFC from the Cambie Street Bridge, looking down First Avenue.

Taken by SFUVancouver, May 3rd, 2011.


Maynards Block.

Taken by SFUVancouver, May 3rd, 2011.


Maynards Block project detail.

Taken by SFUVancouver, May 3rd, 2011.


James as seen from the Cambie Street Bridge.

Taken by SFUVancouver, May 3rd, 2011.

James from Crowe Street.

Taken by SFUVancouver, May 3rd, 2011.

Form work is starting for the townhouse podium next to the mid-rise tower at the end of the block.

Taken by SFUVancouver, May 3rd, 2011.


Wall Centre False Creek.

Taken by SFUVancouver, May 3rd, 2011.


Site prep and top soil removal and recovery is under way for Pinnacle's next project in the neighbourhood.

Taken by SFUVancouver, May 3rd, 2011.


Insulated pipe for the expansion of the neighbourhood energy utility to Main street is being assembled in the vacant lot beside the Olympic Village.

Taken by SFUVancouver, May 3rd, 2011.


First and Main supportive housing.

Taken by SFUVancouver, May 3rd, 2011.


Taken by SFUVancouver, May 3rd, 2011.




Quote:
Originally Posted by hollywoodnorth View Post
nsulated pipe for the expansion of the neighbourhood energy utility to Main street is being assembled in the vacant lot beside the Olympic Village.

I take it then it is going to hook up with the First and Main supportive housing?
Yes, the First and Main supportive housing is being hooked up to the NEU.
However they are also going to be installing the connections for future projects on the Burger King site and the Intermechanica/Busters towing site, which is an active rezoning.


Quote:
Originally Posted by officedweller View Post
That reminds me - there's huge cables/insulated pipes along the Downtown Streetcar RoW adjacent to 6th Ave. Anyone know what's being installed?
I'm pretty sure those are the new electrical circuits BC Transmission Corp is running from its major substation somewhere in Kits to the new one in Mount Pleasant.
They are also tunnelling a new line from David Lam Park to meet up with this new trunk circuit and will be extending the circuit over to the Main and Union substation.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:58 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.