Posted Jan 14, 2011, 7:22 AM
|
 |
Construction Enthusiast
|
|
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
|
|
That lot at the corner of 16th and Centre MUST be kept open for a potential station entrance. If a subway is ever going to go up that way, the presence of open lots like that one along the way will make or break the budget. Some open space to use during construction will make a large difference in the final project cost.
Other than that lot, and maybe a similar lot by Edmonton Trail (in case it works better to build the subway up that route), build mixed use with retail frontage along 16th, it shouldn't be too hard.
|