Old Posted Oct 27, 2009, 11:47 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by Franky View Post
If the tunnel extends all the way to Lees ave., do you think there would be enough room now to run a tunnel from Nicholas to the Macdonald Cartier bridge using the same oval TBM resulting in 3 truck lanes to bypass King-Edward and centre-town? We've had a few deaths and close calls that could be avoided with a tunnel. About $100M/km for 2 km or about $200M, probably a bit more. Maybe Richard's idea of purchasing the TBM would make sense in this case or at least getting some sort of package deal?

4-lanes in a single bore:

http://blog.seattletimes.nwsource.com/northwestvoices/2009/04/23/tunnel_to_replace_viaduct.html

16.5 m diameter! 214 m^2; 214,000 m^3/km 214/140*45 = ~$70M/km (+$35M/km for ventilation, asphalt) more for the support structure, but 4 lanes.
That would be a totally separate project, but badly needed as well.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:50 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.