HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Oct 24, 2009, 8:10 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Zassk View Post
The M-line is ridiculously gold-plated. Everything about it screams reckless NDP spending. We will never get another line like that again. If you think the Evergreen or UBC stations will live up to the existing M-line stations, then I think you are living in a dream land.

As I said before, I would happily accept getting 3 stations at C-line quality rather than 2 stations at M-line quality for the same price.
The M-Line stations cost around $25-million each....which happens also to be the approximate cost for each Canada Line elevated station at half the length, after 5 years of inflation.

Hardly gold-plated. At best, the more aesthetically pleasing designs would have increased overall project costs marginally. The bulk of the project's cost is in rail infrastructure.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:50 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.