HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 21, 2009, 8:45 AM
CLC CLC is offline
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by deasine View Post
Well firstly, the extension of the line is completely new, opened a week ago. If you look at the overall area, Victoria Harbour is three MTR lines, excluding the Airport Express as I don't think anyone would want to pay a premium fare from Kowloon Stn to Hong Kong/Central Stn. Austin Stn and Kowloon Stn is essentially like Vancouver City Centre Stn with Granville Stn in terms of geographical location, except Austin and Kowloon are directly connected via bridge. Give this one a little more time to develop. And not half of them is deserted... Austin is really the only new stn.
I don't want to go to specifics on each station of the HK West Rail. A number of other West Rail stations does seem deserted by HK standard (though my last trip to HK was 2006). I checked that its per day ridership exceeded 200,000 in 2007, though its capacity is said to be 100,000 passenger per hour! Now connected with TST, it probably added up tens of thousands more but likely still below 300,000.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.