HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 12, 2009, 2:53 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Burnaby will be building a new clear span bridge to Burnaby Village.

Quote:
The Consultant shall develop a design and contract documents, as well as providing contract administration services for a clear span pedestrian bridge at Burnaby Village Museum. The review shall determine the most suitable location for the bridge to meet environmental and programming objectives. The location will determine the length of the structure which is anticipated to have a clear span in the range of 80 ft. to 100 ft. The design, including the choice
of building materials and restoration of the affected areas, need to reflect work in an environmentally-sensitive area
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 2:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.