Posted Jan 13, 2009, 2:35 AM
|
 |
Ferris Wheel Hater
|
|
Join Date: Jun 2006
Posts: 8,371
|
|
With the built in pumping system and the forms already made they could be at ground level in just over 2 months, probably end of march would be my predication if there aren't any stumbles.
|