I was wondering about this too. The only reason I can think of for South Group waiting to tear down that abandoned brick building (to make way for the promised park) is that the construction trailer sits right up against it. Maybe they're waiting to finish evo and get the trailer out of there to do the demo.
On multiple weekends there have been firefighters performing tests for demo on this building, so I guess that could be part of the hold-up as well??
Quote:
Originally Posted by citywatch
I wonder why it's taking so long to tear down the small brick bldg that is south of Luma, which is the 3 floor structure visible behind Evo? I recall it looking clearly graffitied & abandoned, esp as seen from the Hope St side.
|