HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Mar 24, 2008, 8:02 PM
HSVTiger's Avatar
HSVTiger HSVTiger is offline
America's Mars Rocket
 
Join Date: May 2003
Location: Huntsville
Posts: 3,873
by Marian Accardi March 24, 2008 Huntsville Times

A slow leak over the last month at the 10-acre lake at Bridge Street Town Centre in Cummings Research Park is the result of a faulty structural connection with one of the storm drain pipes, according to the center's marketing director Niki Hogan.

Divers were brought in to locate the problem, which began more than a month ago, Hogan said. Repairs should be made and the lake refilled in two weeks at the most.


Eric Schultz Photo
The paddle boats and Bridge Street's signature gondola are out of commission until the lake is refilled.
The water level is too low, she said, for the gondola and paddle boats to operate right now.
"We look forward to our lake being 100 percent filled and operable in the coming weeks," said Hogan.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast
Forum Jump



Forum Jump


All times are GMT. The time now is 3:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.