Big stockpile of base material at the data centre site. Made a big pile of wet dirt next to the pile of top soil just outside the east side of the site. Still drying out the Grasslands site with fans. Final grade for the next section of Costco parking lot to be paved. They ran the reclaimer at the entrance by the gas station yesterday, and in a wedge close to the building today. Hauling off dirt piles from the NE corner of the site so they can start parking lot work over there.