HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #21  
Old Posted Mar 12, 2026, 6:38 PM
obemearg obemearg is offline
Registered User
 
Join Date: Sep 2021
Location: NYC / San Francisco
Posts: 170
Quote:
Originally Posted by Busy Bee View Post
The Portal's(DTX) "portal" should be moved south to before Mission Bay Dr or ideally before 16th St so the entire alignment is below grade from the Pennsylvania Ave tunnel to Transbay. I don't understand why they're designing it like this having a couple thousand feet of at grade running instead of a trench or tunnel. Plus the DTX ramp wastes a bunch of space with this development.
There's a plan to eventually do that with an pretty thorough preliminary study completed a few years ago: https://www.sfcta.org/projects/pennsylvania-avenue-extension

https://www.sfcta.org/sites/default/file...oject%20Initiation%20Report%20Signed.pdf

But considering that the portal isn't anticipated to open until 2035 (assuming it gets funded and all goes well), it's probably several decades away.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 1:54 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.