HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 20, 2025, 2:43 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,548
NCR Eastern Bridge Public Engagement Process begins

Summary of technical studies
https://ncc-website-2.s3.amazonaws.com/documents/Eastern-bridge-technical-studies.pdf

Transportation highlights:
  • Increased traffic on Montée Paiement and the Aviation Parkway estimated to be between 700 and 1,960 vehicles in the morning peak hour. [Can we assume the same in the afternoon?]
  • A single STO transit route operating at 15-minute intervals is proposed for the new crossing. The proposed route would connect the Blair O-Train station via Ogilvie Road to the Rapibus’s La Cité station near Maloney Boulevard.
  • It is estimated that the new corridor would attract between 14% to 28% of the interprovincial truck traffic.
  • The Aviation Parkway, Montée Paiement and the bridge may be reduced in cross-section from from the six lanes proposed in earlier studies to four.

Site & Survey:
https://ncc-ccn.gc.ca/projects/eastern-bridge-in-the-national-capital-region
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:30 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.