Originally Posted by ASU Diablo View Post
Didn't realize this project was so far along and the 202/97th Ave segment is scheduled to begin construction in 2027. Similarly, Loop 303 (Van Buren to MC85) which will connect to SR30, will "advertise for construction this summer."

https://azbex.com/budgets-funding/mag-meetings-detail-prop-479-freeway-life-cycle-plans/
It's disappointing the most critical phase of this construction isn't scheduled to go until last. It cannot become a true I-10 reliever until it connects to the Durango curve. Getting the 30 to connect the 202 to Dysart road by 2031 isn't nothing, but most of that traffic on the I-10 west in the afternoons generates in Phx, Scottsdale and Tempe and so the mini stack and tunnel will be a mess for at least another decade plus.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 8:36 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.