HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 29, 2025, 4:48 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,181
Quote:
Originally Posted by Tvisforme View Post
The Wikipedia article on the Canada Line references a Daily Hive article from 2017 that highlights potential stations at YVR, Capstan, 57th and 33rd
I think the engineering to provide a possible future station was to create a level section of track, rather than following the contours of the street. I don't think any actual structures were built as part of the cut and cover tunnels. It's possible there's some sort of structure that allows the removal of a section of the wall, but I doubt that it would be obvious in any images of the construction.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.