HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 31, 2024, 3:34 AM
MonctonRad's Avatar
MonctonRad MonctonRad is offline
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 40,906
Site prep has started on a large lot on DesBrisay Street in the MID West Industrial Park, just to the west of Greystone Energy Systems (also under construction), and, across the street from JessEm Tools.

No word yet on who the tenant will be, but, this is a large combo lot, so it will be something substantial.

The existing portion of MID West is now about 90% full. I fully expect phase two of MID West to begin construction next year (2025). This will entail extending Horsman to Delong Drive, with a new overpass over the CNR mainline. Additional roadwork will be done, as well as service installation.Land has already been sold in phase 2 for a couple of very large mystery tenants. They obviously won't be starting construction until 2026-27, but, hopefully we might find out who these enterprises will be.


Phase 1 of the MID West expansion. The two large lots are for the mystery tenants.
__________________
Go 'Cats Go

Last edited by MonctonRad; Dec 31, 2024 at 3:46 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 12:21 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.