HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #9  
Old Posted Jun 23, 2024, 5:35 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Migrant_Coconut View Post
Dunno about that. With the current system, 2/3 trains go to Surrey and 1/3 to Production Way. Split them evenly between Newton and Langley, that’s a 16% reduction for Langley and potentially 50% for Newton (as opposed to a separate line).

A PW spur has merit, but only to increase capacity to Surrey - it’ll need all the capacity it can get.
easy solve. we will build a 3rd track, for peak hour peak direction express service! then resume regular service once onto the 2 track system.

(thatll never happen. )
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.