HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 28, 2024, 5:53 PM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,891
Bear in mind that this study was commissioned by my beloved District of North Vancouver who has a vested interest in ensuring that the Ironworkers' is replaced by a higher capacity road bridge. I'm sure that was one of the requirements given to the consultants. The two eastbound only (i.e. GTFO THE NORTH SHORE) collector lanes are a little ridiculous and on the edge of absurdity.

Quote:
Originally Posted by djmk View Post
A skytrain station at 3rd and lonsdale is 5 long blocks uphill from the seabus.

Nobody lives around Moodyville
Quote:
Originally Posted by BaddieB View Post
It really would make way more sense for the route to go along Lower Level Road, rather than 3rd, where no doubt they would have to bore it at the cost of a few hundreds of millions more.
There's almost no reason for this line to intersect with the Seabus. I've given my reasons in the Transit Fantasies thread. Basically, this line is about East-West North Shore connectivity funnelled to the Second Narrows, whereas the Seabus is designed for North-South North Shore connectivity funnelled to the Seabus. There wouldn't be very many people given additional service by aligning the Skytrain closer to the waterfront, and you'd be reducing service for a lot of people. The closer to the water the stations are, the more water you're servicing and the less land you're servicing.

Quote:
Originally Posted by djmk View Post
And 2! 90 degree turns

Why would they do that?
The Evergreen Line has a 90 degree turn at Pinetree and something like a 50 degree turn at North Road. It's definitely doable but I personally think this is an extremely inefficient route. I'm not sure why, but people seem be getting stuck on this big S (Cassiar-Hastings-Willingdon) design.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:32 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.