I'm slow in posting these photos that I took on the 17th. The remodeling work at Kalamazoo Central High School has begun. The $4 million project consists of replacing all of the original exterior, precast aggregate panels with insulated metal wall panels, resulting in a refreshed look and more energy-efficient building -
Bonus shots of the new baseball / softball fields (the snow is all melted now) -