HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


    Mahogany at Mill Lake in the SkyscraperPage Database

Building Data Page   • Abbotsford Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #101  
Old Posted May 13, 2010, 3:56 AM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by squeezied View Post
well I'm just in a co-op term for only 3 months so I'll suck it up with the commute, though the drive will be pretty hellish in the summer heat as my old rustic corolla doesn't have ac. owellz
ahhaha well a few guys in my office have similar commutes, one from downtown, one for north van, and one from burnaby....they say its not too bad since its going against the traffic. Guy from burnaby transfered here from our downtown office a few months back, says the commute is shorter to abbotsford than to downtown.

I'm assuming you're with levelton?
Reply With Quote
     
     
  #102  
Old Posted May 13, 2010, 4:17 AM
squeezied's Avatar
squeezied squeezied is offline
Registered User
 
Join Date: Jul 2006
Location: Vancouver, BC
Posts: 1,625
yep. you're not with golder are you? cuz I believe they already moved in a while back.
Reply With Quote
     
     
  #103  
Old Posted May 13, 2010, 5:07 AM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by squeezied View Post
yep. you're not with golder are you? cuz I believe they already moved in a while back.
nope...stantec....I'm EE, we have M&E in abbotsford.

We got the 5th floor.
Reply With Quote
     
     
  #104  
Old Posted May 13, 2010, 5:13 AM
Sonicwolf Sonicwolf is offline
Registered User
 
Join Date: Jan 2009
Location: Abbotsford
Posts: 68
Quote:
Originally Posted by Jefff View Post
Anyway, there seems to be a lot of high rises on the table....3 more towers on Gladwin, a couple on S. Fraser way, etc...I think Abbotsford might be finally moving in the right direction and the next few years look like they could be pretty exciting
If you know of any, even if written here already, describe away. I only know of the Mahogany, Brio (cancelled), Riva (cancelled), 1 tower on gladwin and 4 at the Red Robin site across from the Emco Building.
Reply With Quote
     
     
  #105  
Old Posted May 13, 2010, 5:18 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,298
I worked at Stantec Abbotsford until over a year ago. Mill Tower looks pretty awesome. I stop by every few months to say hi to the gang so I'll be sure to drop by once you guys are in.

it really would've been the eight floor if they removed those stupid silos and built actual floors!!
Reply With Quote
     
     
  #106  
Old Posted May 13, 2010, 5:28 AM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Donald?
Reply With Quote
     
     
  #107  
Old Posted May 13, 2010, 6:23 AM
mike474's Avatar
mike474 mike474 is offline
Registered User
 
Join Date: Jun 2009
Location: Copenhagen
Posts: 600
Yay Abbotsford!
Reply With Quote
     
     
  #108  
Old Posted May 13, 2010, 8:29 AM
Dylan Leblanc's Avatar
Dylan Leblanc Dylan Leblanc is online now
Website Manager
 
Join Date: Dec 1999
Posts: 9,593
Quote:
Originally Posted by Jefff View Post
I'm kind of a newb here so I'm not sure if it's appropriate to post a thread about an already completed project, but my company is moving into the new Mill Tower on Gladys ave. I thought it was a pretty interesting building:

http://www.milltower.ca/

we move on friday, If you guys are interested I'll take some pics and post em up.
Hi Jeff and welcome to the forum! Thanks for the information about the Mill Tower, I have added it to our database - http://skyscraperpage.com/cities/?buildingID=85948

It's a strange building! I see the website says it has only five floors. I can see two floors at the bottom and three floors at the top of the tower, but I wonder what is in the space between them?
Reply With Quote
     
     
  #109  
Old Posted May 13, 2010, 8:40 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Blazed Member - Citygater
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,346
welcome jeff
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #110  
Old Posted May 13, 2010, 8:49 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Oh I get it, I read on the website it was a farm infrastructure tower in the 1960s and it's been renovated into an office tower. I guess a great place for an architectural / engineering firm to be.
Reply With Quote
     
     
  #111  
Old Posted May 13, 2010, 3:16 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,298
Quote:
Originally Posted by Jefff View Post
Donald?
Jeff?
Reply With Quote
     
     
  #112  
Old Posted May 13, 2010, 5:04 PM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by Dylan Leblanc View Post
Hi Jeff and welcome to the forum! Thanks for the information about the Mill Tower, I have added it to our database - http://skyscraperpage.com/cities/?buildingID=85948

It's a strange building! I see the website says it has only five floors. I can see two floors at the bottom and three floors at the top of the tower, but I wonder what is in the space between them?
thanks for the welcome. Yeah the middle stories are silo that couldn't be removed. Each of the 5 floors do have 20 foot ceilings though, our office has a nice mezzanine.

Quote:
Originally Posted by hollywoodnorth View Post
welcome jeff
thanks

Quote:
Originally Posted by red-paladin View Post
Oh I get it, I read on the website it was a farm infrastructure tower in the 1960s and it's been renovated into an office tower. I guess a great place for an architectural / engineering firm to be.
Yeah, personally I think they could have done a little more to make it look better, but I guess it came down to money, and they spent it all cleaning everything up.

Quote:
Originally Posted by DKaz View Post
Jeff?
ahahaha yes sir!
Reply With Quote
     
     
  #113  
Old Posted May 13, 2010, 5:17 PM
androo_k androo_k is offline
Registered User
 
Join Date: Mar 2010
Posts: 25
Quote:
Originally Posted by Sonicwolf View Post

Photo taken by me.

That is the sign on the parking lot on Gladwin.
which corner is this? is it the south east which would be the Parking lot for the mall?
Reply With Quote
     
     
  #114  
Old Posted May 13, 2010, 6:59 PM
Kodii Kodii is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 341
Northwest I believe, based on the description posted. I think it's the lot between the complex with Nando's and Superstore, and adjacent to the new Sandman hotel.
Reply With Quote
     
     
  #115  
Old Posted May 13, 2010, 7:03 PM
Sonicwolf Sonicwolf is offline
Registered User
 
Join Date: Jan 2009
Location: Abbotsford
Posts: 68
Quote:
Originally Posted by androo_k View Post
which corner is this? is it the south east which would be the Parking lot for the mall?
It's the Gladwin Crossing complex's north parking lot, just south of Superstore and east of the new Sandman. Its the north west corner of the south fraser way - gladwin intersection. * *

* * Beaten to the punch.

Here is another dev. proposal:

Photo taken by me.

It seems this one has been sitting for a couple years now. I read somewhere in city council records in regards to the latest Mahogany issues that this proposal is expected to be expanded in area shortly. I am guessing that if this one does happen it will soon as it is the same company that built the Emco Building across the street... which looks pretty sharp in downtown I might add.


Photo taken by me.

Last edited by Sonicwolf; May 13, 2010 at 7:16 PM.
Reply With Quote
     
     
  #116  
Old Posted May 13, 2010, 8:11 PM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by Sonicwolf View Post

It seems this one has been sitting for a couple years now. I read somewhere in city council records in regards to the latest Mahogany issues that this proposal is expected to be expanded in area shortly. I am guessing that if this one does happen it will soon as it is the same company that built the Emco Building across the street... which looks pretty sharp in downtown I might add.
yeah, same owner....Hopefully the "sun people" will stay out of that ones way too...ahah

more pictures of the emco building:
http://keystonearch.ca/?action=d7_ar...e=project.htm7
Reply With Quote
     
     
  #117  
Old Posted May 13, 2010, 8:18 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,298
Quote:
Originally Posted by Jefff View Post
ahahaha yes sir!
lol we only saw each other maybe a couple of times but I know you!!! lol.

Man I stlll remember the standoff in 2007, were you stuck in there? Craziness, hopefully it's better across the tracks. I have videos!

http://www.youtube.com/watch?v=pueFqMczvwc
Reply With Quote
     
     
  #118  
Old Posted May 14, 2010, 7:27 AM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by DKaz View Post
lol we only saw each other maybe a couple of times but I know you!!! lol.

Man I stlll remember the standoff in 2007, were you stuck in there? Craziness, hopefully it's better across the tracks. I have videos!

http://www.youtube.com/watch?v=pueFqMczvwc
hahah yeah, that was ridiculous.....

Make sure you say hi when u come visit, im tucked away in the back corner, avoiding the wrath of a certain someone at the front
Reply With Quote
     
     
  #119  
Old Posted May 29, 2010, 4:50 PM
RosstheBoss RosstheBoss is offline
Registered User
 
Join Date: May 2009
Posts: 65
so when does construction start on this, and when will it be finished I'm assuming they already have the design done for this, right?
Reply With Quote
     
     
  #120  
Old Posted Jun 24, 2010, 10:17 PM
Jefff Jefff is offline
Registered User
 
Join Date: May 2010
Location: Abbotsford/Langley
Posts: 15
Quote:
Originally Posted by RosstheBoss View Post
so when does construction start on this, and when will it be finished I'm assuming they already have the design done for this, right?
I believe they are applying for BP at the end of the year.....construction will most likely begin a few months after that.....

Design is far from complete.....the consultants (elec, mech, struct, etc, etc) have not been chosen.....
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 11:12 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.